Firda
13 sites in production area 4
About the groupThe group is put together by The Salmon Ledger: companies are linked to it from their names and a manual list. No open register publishes ownership between companies, so subsidiaries with other names may be missing, and ownership shares are not shown.
9Place in the group rankings, 2025of 74 groups and companies with at least 52 counted weeks
15Weeks above the lice limit in 20254.7% of 316 counted weeks
2Companies in the group1 reported lice counts in 2025
13Registered sites7 with a lice report in the last four weeks
109Lice treatments in 2025
0Escaped fish in 20250 escapes reported
Share of farm-weeks above the lice limit
Per subsidiary, 2025. Commercial food-fish farms. The line marks the industry average.
- Firda Sjøfarmer AS15 of 316 weeks4.7%
Show as table
| Company | Share above the limit | Industry average |
|---|---|---|
| Firda Sjøfarmer AS15 of 316 weeks | 4.7% | 3.1% |
Farms
| Farm | Municipality | Status, latest count | Adult female lice | Weeks over 2025 | Treatments 2026 |
|---|---|---|---|---|---|
| Djupeleget Firda Havbruk AS · PO 4 | Høyanger | Below the limit 21 Sep 2026 | 0.02 limit 0.5 | 0 of 17 | 6 |
| Hardbakkeneset Firda Havbruk AS · PO 4 | Gulen | Below the limit 21 Sep 2026 | 0.25 limit 0.5 | 0 of 35 | 3 |
| Hyseneset Firda Havbruk AS · PO 4 | Gulen | Below the limit 21 Sep 2026 | 0.00 limit 0.5 | 1 of 52 | 0 |
| Kjerringneset Firda Havbruk AS · PO 4 | Gulen | Below the limit 21 Sep 2026 | 0.00 limit 0.5 | 0 of 32 | 0 |
| Kuøyna Firda Havbruk AS · PO 4 | Gulen | Near the limit 21 Sep 2026 | 0.48 limit 0.5 | 1 of 25 | 10 |
| Leiholmane Firda Havbruk AS · PO 4 | Gulen | Near the limit 21 Sep 2026 | 0.49 limit 0.5 | 0 of 10 | 18 |
| Lyngholmen Firda Havbruk AS · PO 4 | Gulen | Below the limit 14 Sep 2026 | 0.15 limit 0.5 | 0 of 24 | 3 |
6 sites with no lice report in the last four weeks
Hatcheries and land-based sites, fallow sites, and farms that need not count (below 4 °C counts are every 14 days). A missing report does not mean the farm is below the limit.
- Bårøylast report 03 Mar 2025
- Elvenesetlast report 01 Jun 2026
- Hatlem ØHyllestad
- Kjeringeholmenlast report 06 Jul 2026
- Saltskår SSolund
- Storlialast report 30 Mar 2026