Nordlaks
44 sites in production area 9, 10 · nordlaks.no
About the groupThe group is put together by The Salmon Ledger: companies are linked to it from their names and a manual list. No open register publishes ownership between companies, so subsidiaries with other names may be missing, and ownership shares are not shown.
18Place in the group rankings, 2025of 74 groups and companies with at least 52 counted weeks
9Weeks above the lice limit in 20251.0% of 881 counted weeks
4Companies in the group1 reported lice counts in 2025
44Registered sites18 with a lice report in the last four weeks
93Lice treatments in 2025
unknownEscaped fish in 2025at least one escape has no count
Share of farm-weeks above the lice limit
Per subsidiary, 2025. Commercial food-fish farms. The line marks the industry average.
- Nordlaks Havbruk AS9 of 881 weeks1.0%
Show as table
| Company | Share above the limit | Industry average |
|---|---|---|
| Nordlaks Havbruk AS9 of 881 weeks | 1.0% | 3.1% |
Farms
| Farm | Municipality | Status, latest count | Adult female lice | Weeks over 2025 | Treatments 2026 |
|---|---|---|---|---|---|
| Alterosen Nordlaks Havbruk AS · PO 9 | Vågan | Near the limit 21 Sep 2026 | 0.46 limit 0.5 | 0 of 10 | 1 |
| Dragnes Nordlaks Havbruk AS · PO 9 | Hadsel | Below the limit 14 Sep 2026 | 0.11 limit 0.5 | 0 of 25 | 4 |
| Fornes Nordlaks Havbruk AS · PO 9 | Lødingen | Below the limit 21 Sep 2026 | 0.04 limit 0.5 | 1 of 17 | 4 |
| Forsåstorvika Nordlaks Havbruk AS · PO 9 · broodstock: the limit may differ | Hamarøy | Below the limit 21 Sep 2026 | 0.32 limit 0.5 | 0 of 23 | 2 |
| Hallvardøy Nordlaks Havbruk AS · PO 9 · broodstock: the limit may differ | Lødingen | Near the limit 21 Sep 2026 | 0.43 limit 0.5 | 0 of 17 | 3 |
| Haug Nordlaks Havbruk AS · PO 10 | Kvæfjord | Below the limit 21 Sep 2026 | 0.10 limit 0.5 | 0 of 21 | 4 |
| Hoholmen Nordlaks Havbruk AS · PO 9 | Hadsel | Below the limit 21 Sep 2026 | 0.00 limit 0.5 | unknown | 0 |
| Holandselv Nordlaks Havbruk AS · PO 10 | Kvæfjord | Below the limit 21 Sep 2026 | 0.07 limit 0.5 | 0 of 35 | 1 |
| Hulløyhamn Ø Nordlaks Havbruk AS · PO 9 | Hamarøy | Below the limit 21 Sep 2026 | 0.31 limit 0.5 | 0 of 9 | 4 |
| Høgholmen Nordlaks Havbruk AS · PO 10 | Harstad | Below the limit 21 Sep 2026 | 0.32 limit 0.5 | 0 of 32 | 1 |
| Kalvhodet Nordlaks Havbruk AS · PO 9 | Vågan | Below the limit 21 Sep 2026 | 0.04 limit 0.5 | unknown | 5 |
| Risvik Nordlaks Havbruk AS · PO 9 · broodstock: the limit may differ | Hamarøy | Below the limit 21 Sep 2026 | 0.31 limit 0.5 | 0 of 34 | 4 |
| Skommesvik Nordlaks Havbruk AS · PO 10 | Kvæfjord | Below the limit 21 Sep 2026 | 0.11 limit 0.5 | 0 of 28 | 5 |
| Stormneset Nordlaks Havbruk AS · PO 9 · broodstock: the limit may differ | Hamarøy | Near the limit 07 Sep 2026 | 0.49 limit 0.5 | 0 of 30 | 3 |
| Toppsund V Nordlaks Havbruk AS · PO 10 | Harstad | Below the limit 21 Sep 2026 | 0.22 limit 0.5 | 1 of 48 | 2 |
| Toppsund Ø Nordlaks Havbruk AS · PO 10 | Harstad | Below the limit 21 Sep 2026 | 0.39 limit 0.5 | 0 of 41 | 5 |
| Ytre Hadseløya Nordlaks Havbruk AS · PO 9 | Hadsel | Below the limit 21 Sep 2026 | 0.05 limit 0.5 | 0 of 15 | 0 |
| Ytre Stræte Nordlaks Havbruk AS · PO 10 | Tjeldsund | Below the limit 21 Sep 2026 | 0.00 limit 0.5 | 0 of 19 | 1 |
26 sites with no lice report in the last four weeks
Hatcheries and land-based sites, fallow sites, and farms that need not count (below 4 °C counts are every 14 days). A missing report does not mean the farm is below the limit.
- Bogelvalast report 08 Jun 2026
- Brottøylast report 06 Jul 2026
- Bullatholmenlast report 24 Jun 2024
- Bergkråalast report 17 Aug 2026
- Børøya SlaktemerdHadsel
- Dypingenlast report 31 Aug 2026
- Elgenlast report 16 Mar 2026
- Finnkjerkalast report 25 May 2026
- Grønnstrandalast report 30 Sep 2024
- Grøttøylast report 08 Jun 2026
- Helgeneshamnlast report 25 May 2026
- InnhavetHamarøy
- Litjevikalast report 03 Aug 2026
- LitleøyaSortland
- Mastermovika IISørfold
- Molgavlenlast report 04 May 2026
- NusfjordFlakstad
- Ravenlast report 21 Apr 2025
- Sandnes Ølast report 20 May 2024
- Skøyenlast report 30 Mar 2026
- Sortevikalast report 03 Aug 2026
- Steilolast report 11 Aug 2025
- Storfjelllast report 14 Apr 2025
- Sørvikalast report 18 May 2026
- Vestneslast report 01 Jun 2026
- Øvergårdenlast report 02 Sep 2024